Geometry Configurations Part 3 – Control Plans

Technical Note #12

January 2016
By Andreu Tarrida

Imagine you have some new turns to analyse. The first step is to add them either to the existing signal groups or to new groups.

 

Example:

The through turn associated with Signal 1 in the base geometry is not the same through turn as the one in the new geometry, so it will not appear in the new geometry configuration view.



Aimsun Geometry Configurations - Control Plans

No Signal 2 turns exist in the new geometry, so they will not appear in the new geometry configuration view.



Aimsun Geometry Configurations - Control Plans

Add the new through turn in Signal 1 and create Signal 3, which only exists in the new geometry.



Aimsun Geometry Configurations - Control Plans

 

Using the Base Control Plan

If the duration of the phases of the new geometry are no different from the base geometry, you can edit the Base Control Plan by selecting the new signal groups in the corresponding phase. Then use the same Base Master Control Plan in the new scenario.



Aimsun Geometry Configurations - Control Plans

 

Using a new Control Plan

You will only have to create a new Control Plan and Master Control Plan if the duration of the phases for any intersections in the new geometry are different from the base durations. In this case, you must code the new durations in a new Control Plan and then assign it, together with the Base Control Plan, to a new Master Control Plan.



Aimsun Geometry Configurations - Control Plans

 

This new Master Control Plan must contain the base control plan in Zone 1 and the new one in Zone 2. Control Plans in Zone 2 will override those in Zone 1, therefore, if an intersection has both of them defined, the one in Zone 2 will be the one applied.

 

WARNING: Do not use a copy of the base Control Plan in the new Master Control Plan to code the new phase durations because if you want to edit the base control plan afterwards, you will have to apply the changes twice, once in the original base Control Plan and then again in the copy.



Aimsun Geometry Configurations - Control Plans

More technical notes

Using groupings of centroids to split zones

August 2017: Want to update your strategic model zoning system to organise the ever-increasing amount of data available? Dimitris Triantafyllos and Paolo Rinelli show you how to split zones to better represent the entrance and exit of the traffic volumes in the network.

  • Got a question? Get in touch.

    We are here to help!

SHARE

Cite Aimsun Next

Aimsun Next 24

Aimsun (2024). Aimsun Next 24 User’s Manual, Aimsun Next Version 24.0.0, Barcelona, Spain. Accessed on: April. 16, 2024. [Online].

Available: https://docs.aimsun.com/next/24.0.0/

Aimsun Next 24

@manual {AimsunManual,
title = {Aimsun Next 24 User’s Manual},
author = {Aimsun},
edition = {Aimsun Next 24.0.0},
address = {Barcelona, Spain},
year = {2024. [Online]},
month = {Accessed on: Month, Day, Year},
url = {https://docs.aimsun.com/next/24.0.0},
}​​​​​​​​​​​​​​​

Aimsun Next 24

TY – COMP
T1 – Aimsun Next 24 User’s Manual
A1 – Aimsun
ET – Aimsun Next Version 24.0.0
Y1 – 2024
Y2 – Accessed on: Month, Day, Year
CY – Barcelona, Spain
PB – Aimsun
UR – [In software]. Available:
https://docs.aimsun.com/next/24.0.0/